Sunday, January 27, 2013
Blowing In
After a lovely weekend in warmer climes, the wind blew us back to the ranch. And maybe blew a few tumbleweeds, too. (Like the one in the middle of the road? And two more are to the left of the road, and will soon be across it.) I have lots to write, so hopefully I'll find some energy soon. I hope you've had a good weekend!
Thursday, May 3, 2012
Wind Farm Update
I posted about the Spring Valley wind farm in March and had some request for updates. Here we go...
This is what it looked like heading down from Sacramento Pass into Spring Valley on April 8. The towers had expanded greatly.
The whole first row (of five rows) was completed. One wind mill is not quite in line. I'm sure there's a story behind that, and maybe some day I can find out. Ely High School took some field trips out to the wind farm in April, so I'm hoping that there will be a public field trip available to learn more about it.
More construction scenes, taken from the highway.
We still are seeing police escorts and oversize loads frequently. Apparently the wind has made the wind project about 25 days behind schedule. That means they will still be transporting parts for another three weeks. (I am hearing all this information second or third hand, so if someone knows better, please leave a comment!)
Getting behind these oversize loads over the mountain passes means that it will take an extra half hour over each pass.

Here is what Spring Valley looks like as of April 29. Over half of the wind mills are constructed, with many more partially up.
These are the second and third rows of the wind turbines.
Spring Valley sure looks a lot different.
I think I'll leave it at that.
This is what it looked like heading down from Sacramento Pass into Spring Valley on April 8. The towers had expanded greatly.
The whole first row (of five rows) was completed. One wind mill is not quite in line. I'm sure there's a story behind that, and maybe some day I can find out. Ely High School took some field trips out to the wind farm in April, so I'm hoping that there will be a public field trip available to learn more about it.
More construction scenes, taken from the highway.
Getting behind these oversize loads over the mountain passes means that it will take an extra half hour over each pass.
Here is what Spring Valley looks like as of April 29. Over half of the wind mills are constructed, with many more partially up.
These are the second and third rows of the wind turbines.
Spring Valley sure looks a lot different.
I think I'll leave it at that.
Sunday, March 18, 2012
Wind turbines going up in Spring Valley
For the record, I think that wind energy is great. It's renewable and it's fairly clean. However, this wind farm is poorly sited, with a cave that is an important migratory stopover for over a million bats each year only a few miles away. I talk more about the cave in this post, so I won't dwell on that here.
The cranes are enormous, although they don't look that big in this photo. I looked up the specs for Siemens 2.3 MW turbines. I'm not sure what model they're using, but here's more info on the 113. The 113 model means that the diameter of the rotor is 113 m (about 350 ft--longer than a football field!) Each of the three blades is 55 m (~160 ft) long. The swept area is 10,000 meters squared. The rotation speed is 6-13 rotations per minute (that seems fast to me for such a huge rotor!).
This type of windmill gets very little power when the wind is less than 5 meters/second (11 miles per hour), and in fact the cut-in wind speed (minimum wind speed at which a wind turbine will generate usable power) is 3 meters/second (7 miles per hour). Nominal power is at 12-13 meters/second (27-29 mph). The hub height for each tower is 99.5 m (over 300 feet) or site specific.
So those cranes have to lift a nacelle (cover housing that houses the generator and all the other parts for turning the blades) on top of a tower that is taller than a football field. The nacelle weighs 73,000 kg (160,000 pounds). The generator that must also be lifted to the top of the tower weighs 66,700 kg (147,000 pounds). Three blades must also be lifted that high. That means those are some powerful cranes!
We've been seeing trucks carrying the blades go past on Highway 6 & 50. They usually travel three blades at a time, sometimes with some other assorted parts (like the nacelle or generator or tower parts). In Utah, each truck has a vehicle behind it and in front of it announcing an oversized load. They also have a police escort in front of and behind each of the semis. So for three blades, there are six Utah highway patrol vehicles!
On the Nevada side, I haven't seen the Nevada highway patrol escorting the oversized vehicles.
To get a little perspective of how long these vehicles are, check out the above photo. How many of those pickups could you place alongside the semi and trailer?
I couldn't manage to safely get a photo of the blades traveling down the highway, but when I saw them parked I just had to pull over and take a closer look.
Here's the view from the back. You can see that the blades are not straight, they curve.
Here's me next to one for scale.
These are where the blades attach onto the nacelle.
Yesterday it was too windy to put up the wind turbines (isn't that slightly ironic?). So there were six blades and a couple other parts parked at the Border Inn. If you figure a semi driver and two pilot car drivers per truck, that means 24 people got stranded at the Border Inn for the St. Patrick's Day party. It certainly turned out to be a big party!